Our Approach

A finished lobby stair at handover — pale oak treads and plaster walls.

Six defined steps carry a project from the first call to the final handover, with one accountable team across architecture, engineering and construction. Average schedule variance under 3% across the last 40 projects.

01 Intro Call

A free 30-minute consultation, booked online. We cover scope, site, budget range and the constraints that will shape the work.

02 Discovery

An existing conditions survey, a code review and interviews with everyone who will use or approve the finished building.

03 Workflow Design

A written bespoke plan naming every discipline, each approval gate and the reporting cadence you can expect from us.

04 Design & Engineering

Coordinated architecture and engineering packages, issued together, with permit filing handled on your behalf.

05 Build Oversight

Our owner’s rep on site with cost and schedule controls and a monthly draw review you sign before funds move.

06 Closeout

Punch list, warranties and as-builts handed over, with optional rollover into ongoing property management.

Two ways to build

One accountable team across four disciplines, or a drawing set handed from consultant to consultant. The difference shows up in your schedule.

Bespoke

Four disciplines under one roof: architecture & engineering, project management, owner’s representation, property management. Average schedule variance under 3% across the last 40 projects.

What you get

  • One accountable team
  • Workflow written per client
  • Your interests represented
  • Reporting cadence agreed up front
  • Claims reviewed before approval
  • Continuity from permit to occupancy

Conventional

A single-discipline firm whose scope ends at the drawing set, with the owner left to carry every handoff between separate consultants.

What you absorb

  • Scope ends at the drawings
  • Handoffs between consultants
  • Coordination gaps fall to you
  • Change orders surface late
  • Contractor claims unchallenged
  • A new team at each phase

Questions owners ask before they hire us

Fees, scope, contracts, insurance, timelines and roles, answered plainly so you can judge the fit before any paperwork is drawn.

What Does It Cost

Advisory is hourly, defined design scopes are a fixed fee, and owner’s representation is a percentage of construction value.

Is The First Talk Free

Yes. A free 30-minute consultation, booked online, with no obligation to continue afterwards.

Owner’s Rep Or PM

An owner’s rep sits on your side of the table across the life of the asset; project management runs the delivery of one defined scope.

One Discipline Only

Certainly. Four disciplines: architecture & engineering, project management, owner’s representation, property management — take one or all.

Which Contracts Apply

AIA and ConsensusDocs standard forms. Owner-drafted agreements are reviewed and marked up before signature.

What Insurance Is Held

Professional liability, general liability and workers’ compensation; certificates are issued before mobilisation.

How Long It Runs

Eight weeks for feasibility and permit support; eighteen to thirty months for full owner’s representation through closeout.

Who Is On Site

A named discipline lead day to day, backed by the principal who signed your engagement letter.

How Progress Reports

A monthly cost and schedule report, plus weekly OAC meeting notes. Average schedule variance is under 3% across the last 40 projects.

Do You Travel Out

Yes, where the scope justifies it. We have managed $1.4B in construction value as owner’s representative.

When Are You Open

Offices open Monday to Friday, 8am to 6pm, and messages left overnight are answered the next working morning.

Let’s plan your build together

Who Leads the Work

Every engagement is led by a principal, not handed down to a junior team.

Marcus Elliot Reyes, AIA

Principal

Architecture & owner’s rep. Marcus leads design review and owner’s rep engagements from first sketch to final walkthrough.

Dana Whitfield, PE

Principal

Engineering & project controls. Dana runs engineering and the cost and schedule reporting behind every build.

Alicia Nwosu

Director of Property Management

Alicia runs the property management portfolio, tenant relations and operating budgets after handover.

Built to order since 2009

We started in 2009 in a single rented room with two drafting tables, after watching owners pay twice for the same coordination. Our first commission was a twelve-unit infill walk-up. Engineering came in 2012, when drawings kept stalling at review; the first owner’s rep mandate followed in 2014 on a hotel conversion; property management joined in 2018 so buildings stayed served long after handover.

No two owners carry the same risk, lender or internal staff. So reporting, meeting cadence and decision rights are drafted per client rather than issued as a template.

Founded 2009. 260+ projects delivered across commercial, multifamily and institutional work. Four disciplines: architecture & engineering, project management, owner’s representation, property management. Clients: developers, property owners, contractors and architects.